Curriculum & Overview
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Exam Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
Results
Results
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categorieën
- Niet gecategoriseerd 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect
-
Vraag 1 of 10
1. Vraag
Differences between the DMAIC and DMADV Processes include:
-
Vraag 2 of 10
2. Vraag
________ is a closely managed process of creating a culture accepting of change within an organization.
-
Vraag 3 of 10
3. Vraag
In this phase, teams use data to validate their assumptions about a process or problem.
-
Vraag 4 of 10
4. Vraag
In this phase, loose ends are tied and the project is transitioned to a daily work environment.
-
Vraag 5 of 10
5. Vraag
In this phase, teams develop hypotheses about casual relationships between inputs and outputs, narrow causation down to the vital few, and use statistical analysis and data to validate the hypotheses and assumptions they’ve made so far.
-
Vraag 6 of 10
6. Vraag
A Project Charter:
-
Vraag 7 of 10
7. Vraag
In which phase is ‘storming’, or a period of difficult or challenges where team members begin to get frustrated and impatient and question the viability of the project?
-
Vraag 8 of 10
8. Vraag
Usually the transition between phases of the DMAIC/DMADV process is marked by a ________.
-
Vraag 9 of 10
9. Vraag
It is possible for a team to start with the DMAIC or DMADV approach and realize that they need to switch to the other process mid-project.
-
Vraag 10 of 10
10. Vraag
During which phase of the DMAIC/DMADV process is project fatigue most common?