Finishing and adding background
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Exam Summary
0 of 14 Questions completed
Questions:
Information
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
Results
Results
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categorieën
- Niet gecategoriseerd 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- Current
- Review
- Answered
- Correct
- Incorrect
-
Vraag 1 of 14
1. Vraag
What must happen in order for there to be a positive correlation between two variables?
-
Vraag 2 of 14
2. Vraag
What happens when there is a negative correlation between two variables?
-
Vraag 3 of 14
3. Vraag
Regression should be written as:
-
Vraag 4 of 14
4. Vraag
Which form of data CANNOT be written as a function:
-
Vraag 5 of 14
5. Vraag
A correlation coefficient equal to 0 means:
-
Vraag 6 of 14
6. Vraag
Both correlation and regression work with ________or _________ data
-
Vraag 7 of 14
7. Vraag
When calculating correlation and regression both sets of data must be __________.
-
Vraag 8 of 14
8. Vraag
R(squared) represents a(n) value between ______ and ______
-
Vraag 9 of 14
9. Vraag
The correlation coefficient is also known as the:
-
Vraag 10 of 14
10. Vraag
If the correlation coefficient is equal to 1:
-
Vraag 11 of 14
11. Vraag
A scattered diagram with a horizontal trend line means:
-
Vraag 12 of 14
12. Vraag
In Six Sigma, how are correlation and regression used?
-
Vraag 13 of 14
13. Vraag
When working as a team it is important to determine the optimum_________values to determine a goal for control during a project
-
Vraag 14 of 14
14. Vraag
You may use excel to calculate regression or _______ future trends by creating a Time line fit plot